Skip to content
Tuscan Foundry Products Logo Black
Find out more about our products by giving us a call
0333 987 4452
Linkedin Envelope
  • About Us
  • Buildings
    • Churches
    • Industrial
    • Residential
  • Finishes
  • Products
  • Support
  • Restoration Index
    • Conservation Rooflight Guide
  • Contact
  • News & Articles
  • About Us
  • Buildings
    • Churches
    • Industrial
    • Residential
  • Finishes
  • Products
  • Support
  • Restoration Index
    • Conservation Rooflight Guide
  • Contact
  • News & Articles
£0.00 0 Basket
Tuscan Foundry Products Logo Black
  • About Us
  • Buildings
    • Churches
    • Industrial
    • Residential
  • Finishes
  • Products
  • Support
  • Restoration Index
    • Conservation Rooflight Guide
  • Contact
  • News & Articles
  • About Us
  • Buildings
    • Churches
    • Industrial
    • Residential
  • Finishes
  • Products
  • Support
  • Restoration Index
    • Conservation Rooflight Guide
  • Contact
  • News & Articles
£0.00 0 Basket

Established 1893   |   BS 460:2002 Certified   |   UK & International Supply   |   Expert Technical Support   |   0333 987 4452

What a Tuscan Site Survey Covers: A Guide for Architects and Contractors

  • November 26, 2026
Back
What is recorded in a cast iron rainwater-goods survey, how it is measured, what a survey report should contain, and how to prepare for one.
Surveyor on a tracked aerial platform inspecting the gutters of a stone cottage

A cast iron rainwater-goods survey turns assumptions into measured facts — profiles, dimensions, falls, fixing centres, condition and components. This guide sets out what is recorded, how it is recorded, what a survey report should contain, and how to prepare for one.

In short: A cast iron rainwater-goods site survey records the existing system in enough detail to specify, procure and install a replacement or repair without guesswork. It identifies gutter and pipe profiles positively, measures girths, diameters, lengths, falls, fixing centres and discharge points, assesses condition and coatings, distinguishes original fabric from later replacement, photographs detail in a way that supports pattern-making, and records the interfaces with roof, masonry and drainage. The purpose of a survey is not to inspect the building — it is to produce the information a specification cannot be written without. Measurements should always be verified on site before manufacture. #LABEL# Contents #TOC# 1. What a cast iron rainwater-goods site survey is 2. When a survey is worth commissioning 3. Visual inspection, measured survey, condition survey and heritage assessment 4. What we establish before attending site 5. Access, height, scaffolding and safety 6. Recording the existing system 7. Measuring: lengths, diameters, falls, fixing centres and discharge points 8. Elevations, roof geometry, corners and junctions 9. Identifying damage and inappropriate repair 10. Coatings, paint layers and colour evidence 11. The interfaces with masonry, roofing and drainage 12. Photography that supports design and procurement 13. Telling original components from later replacements 14. Samples, templates and pattern-making 15. How survey findings drive the decision 16. What a survey report should contain 17. Preparing for a survey: a checklist 18. What a survey does not do 19. Buildings where the survey decides the project 20. Frequently asked questions

Every heritage rainwater project rests on a small set of facts: what profile is up there, what size it is, how it is fixed, where it discharges, what condition it is in, and how much of it is original. A site survey exists to establish those facts before money is committed, because every one of them is expensive to discover after the order has been placed. Get the profile wrong and the castings are abortive. Get the fixing condition wrong and the brackets do not suit the eaves. Get the extent of original fabric wrong and the conservation officer refuses the scheme.

This article is written for architects, conservation architects, contractors, surveyors, estates managers, building owners and project managers who are considering replacement, repair or new installation of cast iron rainwater goods, and who want to know what a cast iron rainwater-goods survey actually covers. We have written separately on why on-site surveys matter; this piece is about method — what gets recorded, how, and what you should expect back.

1. What a cast iron rainwater-goods site survey is

A cast iron rainwater-goods survey is a focused technical inspection and measured record of an existing rainwater system, carried out to support specification, procurement and manufacture. It is narrower than a building survey and deeper than a general condition inspection.

The distinction matters because it sets expectations. A building surveyor’s condition report will tell you that the gutters are corroded and the downpipes are leaking. It will not usually tell you that the gutter is a 115 mm Notts ogee rather than a moulded ogee, that three of the eleven brackets are original and the remainder are later steel, that the hopper on the east elevation carries a date panel that will need a pattern, or that the run falls the wrong way for eight metres before the outlet. Those are the facts a foundry and a specifier need, and they are what a rainwater-goods survey is designed to produce.

2. When a survey is worth commissioning

A survey earns its cost whenever the consequences of getting the information wrong exceed the cost of getting it right — which on cast iron work is most of the time, and almost always where bespoke casting, difficult access or listed status is involved.

The situations where we would actively recommend one:

  • The profile cannot be identified with confidence from the ground or from photographs. Ogee variants in particular are very difficult to distinguish at height.
  • Components are missing, damaged beyond recognition, or already removed. There may be nothing left to match against without hunting for surviving evidence on site.
  • Copy casting or bespoke work is proposed. A pattern needs dimensions and, ideally, a physical sample or template.
  • Access is difficult — high elevations, restricted curtilage, sensitive settings, or buildings where scaffold is expensive or slow to obtain.
  • The building is listed or in a conservation area, and the extent of original fabric will determine what consent is granted.
  • The system is performing badly and nobody knows why. Ponding, overflow and staining usually have a geometric cause that only measurement will reveal.
  • The project is being tendered, and ambiguity in the tender documents will be priced as risk by every tenderer.

Conversely, a survey adds little where the building is straightforward, the profile is a common current stock item, an intact sample can be sent to us, and access is simple. We will say so.

3. Visual inspection, measured survey, condition survey and heritage assessment

These four terms are often used interchangeably and mean quite different things. Agreeing which one is being commissioned prevents disappointment on both sides.

Type What it produces Typical use
Visual inspection A qualitative account of what is there and its apparent condition, usually from ground level or from existing access Early feasibility; deciding whether a fuller survey is needed
Measured survey Dimensioned records of profiles, girths, diameters, lengths, falls, fixing centres and component positions Specification, procurement, pattern-making, quotation
Condition survey Systematic assessment of defect type, extent and severity, run by run, with recommended action Planned maintenance, dilapidations, prioritising expenditure
Heritage assessment Analysis of significance, phasing and authenticity, informing what should be retained Listed building consent applications, grant funding, conservation plans

Most rainwater-goods projects need a measured survey with a condition element. A full heritage assessment is normally the province of the project’s conservation architect or heritage consultant rather than the foundry — though what we record about original versus replacement fabric will feed directly into it.

4. What we establish before attending site

Good desk preparation shortens the visit and improves what comes back from it. Before a survey we would normally want whatever exists of the following.

  • Address, listed status or grade if known, and whether the property sits in a conservation area
  • Existing drawings — elevations, sections, roof plans — even if outdated
  • Photographs of the elevations and, critically, close-ups of gutter, hopper and downpipe detail
  • Any previous survey, quinquennial inspection or condition report
  • A description of the problem: where it leaks, where it overflows, where staining appears
  • What is already known about access, and whether scaffold is or will be in place
  • The intended scope — repair, partial replacement, full replacement, or new installation
  • Programme constraints, particularly any fixed date the work must be complete by
  • Who the decision-makers are, and whether a conservation officer or funder is involved

Where a building has been altered repeatedly, historic photographs are unusually valuable. They frequently show a rainwater arrangement that no longer exists, which changes the conversation about what “matching existing” should mean.

5. Access, height, scaffolding and safety

Access determines what a survey can achieve, and it should be settled before the visit rather than discovered on the day. Nothing recorded from the ground with binoculars is a substitute for a hand on the component.

Surveyor on a tracked aerial platform inspecting the gutters of a stone cottage
Surveying gutters on a stone cottage from a tracked aerial platform.

The practical options, in ascending order of what they permit:

  • Ground-level inspection with long lens and measuring aids. Adequate for identifying arrangement, run lengths and obvious defects; unreliable for profile identification and useless for taking templates. We offer ground surveys on this basis.
  • Existing access — a tower, a roof hatch, a walkway or a leadwork gutter you can stand in. Often the most efficient option where it exists.
  • Aerial platform. A mobile elevating work platform gives close, hands-on access to eaves and high level without the cost and programme of scaffold. Our aerial platform surveys for listed and heritage buildings exist for exactly this situation. Ground conditions, headroom and overhead obstructions all need checking first.
  • Scaffold. The most complete access, and worth surveying from whenever scaffold is already up for other work — the marginal cost is nil and the quality of information is the highest available.
  • Drone or elevated photography. Useful for roof geometry, valley and parapet arrangements and inaccessible detail; not a means of measurement or template-taking. We also offer aerial surveys where the roofscape needs recording.

Safety governs all of it. Work at height, fragile roof coverings, unstable or corroded fabric, overhead services, public thoroughfares and the building’s own occupation all constrain what can be done. Where a surveyor cannot safely reach a component, the survey should say so plainly rather than record an assumption.

6. Recording the existing system

The core of the survey is a component-by-component record of what exists, located by elevation and run. Identification is the priority; measurement follows from it.

Tape measure across the outlet of a cast iron hopper head to record its size
Measuring a hopper outlet during a survey.

For gutters, we record the profile family and variant, the girth or nominal size, the section length between joints, the joint type and its condition, the stop end and angle details, and the outlet arrangement. Positive identification matters because cast iron gutter profiles are not interchangeable and several are superficially similar at height. A rubbing, a template or a photograph taken square-on against a rule is worth more than a description.

For downpipes, we record the section — round, square or rectangular — the diameter or dimension, whether pipes are plain on holderbats or eared and fixed direct, the socket arrangement, the length of each drop, and every offset, swan neck, bend and branch. Offsets are worth measuring properly rather than estimating, since projection and drop together determine the fitting required; our note on calculating pipe offsets and swan neck sizes sets out the geometry.

For hoppers, shoes and decorative components, we record the style, overall dimensions, inlet and outlet positions, and any moulded, dated, armorial or monogrammed detail. These are the items most likely to need a pattern, and the items most often overlooked in a schedule taken from drawings alone.

Brackets get their own record: type, material, condition, and — importantly — what they are fixed to, which frequently changes along a single elevation.

7. Measuring: lengths, diameters, falls, fixing centres and discharge points

Measurement converts observation into something that can be ordered. Five measurements do most of the work.

Measurement How it is taken Why it matters
Run length Along the gutter, elevation by elevation, with angles and outlets located Determines quantity, section count and joint positions
Girth or diameter Across the profile, ideally from a template or rubbing rather than a tape Determines the profile and its capacity; the single most common error
Fall Levelled from a datum along the run, recording gutter height at both ends and at the outlet Reveals reverse falls, level sections and ponding causes
Fixing centres Measured between existing brackets, with additional support noted at joints and outlets Establishes the existing support regime and where it has failed
Discharge point Position and type of gully, channel, back inlet or open discharge at low level Determines shoe type and the below-ground interface

Where a gutter is curved, the radius must be established on site — chord and rise measurements, or a template. Radius work cannot be ordered from a description, and our guide to measuring the radius of a curved cast iron gutter sets out the method. Radius gutters typically require 12 to 14 weeks, because template creation must precede pattern-making.

All measurements are working figures until verified. Sand castings carry inherent variation, buildings are rarely square, and a gutter measured at one end of a run may not match the other. The survey should record what was measured, where, and to what accuracy.

8. Elevations, roof geometry, corners and junctions

The rainwater system cannot be understood in isolation from the roof that feeds it, so the survey records geometry as well as components. What we are looking for is anything that changes the water’s behaviour.

That means roof pitch and covering; the catchment area draining to each run; valleys, parapets and box gutters, and where they discharge into the eaves system; internal and external corners; changes in eaves height along an elevation; abutments to adjoining buildings; dormers, turrets and bays that interrupt a run; and any point where two runs meet or one discharges into another.

Unusual details deserve particular attention because they are the ones that will not be covered by a standard schedule. A gutter that steps down over a bay, a run that crosses a party wall, an outlet that discharges through a parapet into a concealed hopper, a downpipe that offsets twice around a projecting stack — each of these needs its own drawing or photograph and its own line in the schedule.

9. Identifying damage and inappropriate repair

The condition record should distinguish between defects that require replacement, defects that can be repaired, and defects that are symptoms of something else. That third category is where most survey value lies.

The defect types worth recording separately:

  • Corrosion — its location, extent and whether it has perforated. Rear faces of downpipes and the back of hoppers corrode first and are the hardest to see.
  • Cracks — through-cracks from frost, impact or fixing stress, and hairline cracking around ears and socket ends.
  • Failed joints — open, displaced, or repeatedly re-sealed with successive generations of mastic.
  • Distortion and displacement — runs pulled away from the fascia, brackets deflected, sections sagging between supports.
  • Blockage — leaves, moss, nesting material, silt and vegetation, and whether the outlet or the pipe is obstructed.
  • Inappropriate repair — this is a category of its own. Bitumen bandage, expanding foam, silicone over rust, mismatched plastic or aluminium sections spliced into a cast iron run, and pipes strapped back with steel banding are all common. Each tells you something about the maintenance history, and each will need to be undone.
  • Consequential damage — staining, saturated masonry, decayed timber at the eaves, internal damp. Where present, this establishes urgency.

Blocked systems do damage far out of proportion to their apparent seriousness; we discuss the mechanism in our note on how blocked rainwater systems damage historic buildings. SPAB’s guidance is worth remembering here: check the system in heavy rain, when leaks that are invisible in dry weather become obvious.

10. Coatings, paint layers and colour evidence

The existing coating is evidence, and it is also a technical constraint on what can be applied next. Record both.

A survey should note the apparent coating type and condition, the number of layers where an edge or a failure exposes them, the colour of the lowest surviving layers, and the presence of any obviously modern film-forming coating. Where a fragment can be taken from an inconspicuous position, a paint scrape or cross-section can establish the historic colour sequence — useful evidence for a conservation officer and often surprising, since a great many buildings now painted black were originally finished in a dark green, a lead grey or a brown.

The practical point is compatibility. A linseed oil system and a modern epoxy or alkyd do not sit happily over one another, and specifying a finish without knowing what is already there is how paint systems fail within a season. Our guides to preparing cast iron rainwater goods and to the linseed oil paint specification cover the sequence.

11. The interfaces with masonry, roofing and drainage

Rainwater goods sit at the junction of several trades, and most failures occur at the junctions rather than in the middle of a run. The survey records the condition of each interface.

At the eaves, that means the relationship between the roof covering and the gutter — whether water discharging from the roof lands in the gutter or behind it, whether the front edge is high enough to contain flow and low enough to shed snow, and the condition of the fascia, soffit or rafter feet the brackets fix into. Decayed bracket fixings are a common cause of failure and are not visible until a bracket is removed.

At the wall, it means how downpipe fixings engage with the masonry — into mortar joints or through the face of a stone, whether fixings have split or spalled the surrounding fabric, and the condition of the wall behind the pipe, which is often the wettest part of the elevation.

At low level, it means the discharge arrangement: shoe over a channel, direct into a gully, back inlet, or straight onto the ground. It is worth recording whether the below-ground drainage is known to be functional, since a perfectly rebuilt rainwater system discharging into a blocked drain will still saturate the wall.

12. Photography that supports design and procurement

Photographs taken for a rainwater-goods survey have a job to do, and they are taken differently from record photographs. The test is whether someone who has never seen the building could specify from them.

That means, for each significant component: a square-on shot with a rule or scale in frame; a section or end-on shot showing the profile against a straight edge or in silhouette; a context shot locating the component on the elevation; and a detail shot of any moulding, date, joint, ear or fixing that a pattern would need to reproduce. Every image needs to be identifiable afterwards — elevation, run, and position — because a folder of two hundred untitled photographs is very nearly as unhelpful as none.

For decorative components intended for reproduction, photograph square-on from directly in front, with the scale in the same plane as the face being recorded, and take supplementary shots from oblique angles to record the depth of relief. Perspective distortion in a single angled photograph is one of the most common reasons a pattern has to be reworked.

13. Telling original components from later replacements

Distinguishing original fabric from later replacement is central to a conservation project, because it determines both what should be retained and what “matching existing” actually means. It is a judgement, and the survey should record the evidence for it rather than simply asserting it.

The indicators worth recording:

  • Foundry marks and pattern numbers, cast into the reverse of gutters, brackets and hoppers. These are the strongest single piece of evidence and are frequently overlooked.
  • Casting character — the surface texture, the crispness of the arris, the parting line, and the weight of the section. Later castings and modern reproductions often differ noticeably.
  • Profile inconsistency along a run, where one section is a near-match rather than a match.
  • Joint and fixing detail that differs from the majority.
  • Paint stratigraphy — an original component will normally carry more layers than a replacement.
  • Documentary evidence — historic photographs, faculty or consent records, previous specifications.

Where a run has been replaced in phases over a century, the honest answer may be that several generations are present. That is worth saying, because it changes the design decision: matching the earliest surviving profile and matching the predominant profile are different projects.

14. Samples, templates and pattern-making

Where components will be reproduced, the survey is also the point at which the physical reference for the pattern is secured. A drawing alone is rarely sufficient for a decorative component.

There are three routes, in descending order of reliability:

  1. A physical sample. A single sound section removed and sent to the foundry is the best possible reference. It captures profile, dimension, joint detail and surface character simultaneously. Removal needs consent where the building is listed, and should be recorded photographically in situ first.
  2. A template. A profile taken on site with a profile gauge, card, lead or thin sheet, checked back against the component before it leaves. Essential for curved work, where chord and rise must also be recorded.
  3. Measured drawings and rectified photography. Workable for simple profiles; demanding for moulded and decorative components, where small errors in the record become visible errors in the casting.

Whichever route is used, the pattern stage should include an approval point before casting proceeds. We set out the process in our guides to copy casting and pattern replication and to bespoke pattern matching. Bespoke and copy cast items typically require 12 to 14 weeks from pattern confirmation to delivery, so the survey date and the required completion date need to be set against that from the outset.

15. How survey findings drive the decision

Survey findings resolve into one of four outcomes for each run or component, and the value of the survey is that the choice is made on evidence rather than on a general impression of age.

Outcome Indicated when What follows
Repair in situ Fabric substantially sound; localised defects; historic significance high Cleaning, local repair, re-jointing, redecoration; minimal disturbance
Remove, repair, refix Sound but distorted, poorly fixed or obscured by failed coatings Careful removal, workshop repair and preparation, new fixings, refixing
Replace from stock Profile matches a current standard section; original fabric already lost Order against confirmed profile; prompt despatch subject to availability
Reproduce or cast bespoke Profile obsolete, decorative components, or nothing suitable exists Pattern from sample or template; 12 to 14 weeks; approval stages built in

In practice most heritage projects use more than one of these across a single building, which is precisely why a run-by-run schedule is more useful than a single recommendation. It also produces a defensible conservation position: retaining what can be retained, and replacing only what must be.

16. What a survey report should contain

A survey report should be structured so that a specifier can write from it, a quantity surveyor can price from it and a foundry can manufacture from it. The structure below is a sound arrangement.

Project information

Building name and address, listed status and grade if applicable, conservation area, client and project team, date of survey, weather and access conditions on the day, and the limitations under which the survey was carried out.

Building description

A short description of the building, its form, roof arrangement and materials, sufficient to orient a reader who has not visited.

Existing system

The rainwater arrangement described by elevation and run: gutter profiles, downpipe positions and sections, hoppers, outlets, brackets and fittings, with an assessment of which components appear original.

Measured dimensions

Tabulated measurements — run lengths, girths and diameters, section lengths, falls, fixing centres, offsets, and discharge positions — cross-referenced to a marked-up elevation or roof plan.

Condition assessment

Run by run, the defects observed, their extent and severity, and whether the cause is local or systemic. Consequential damage to the building fabric should be recorded here.

Photographic record

Indexed and captioned, cross-referenced to the elevations and runs, with scale included where dimensions are being conveyed.

Recommended action

The repair, replace, reproduce or bespoke decision for each run or component, with the reasoning, and a note of which items require pattern-making.

Outstanding information

What could not be established, and why — components not reached, areas obscured, measurements that require verification, and anything that needs confirming when scaffold is available. An honest list here is more useful than a report that implies completeness it does not have.

Installation and access considerations

Access constraints, sequencing with other trades, scaffold requirements, delivery and storage considerations, and any programme implications arising from lead times.

17. Preparing for a survey: a checklist

Time on site is the expensive part. The more of the following that is resolved beforehand, the more the survey will produce.

Before booking

  • Confirm who is commissioning the survey and who will receive the report
  • Establish the intended scope — repair, replacement, or new installation
  • Confirm listed status, grade and conservation area position
  • Identify any consent already granted or applied for, and any conditions attached
  • Confirm the programme, and whether a completion date is already fixed

Information to gather

  • Existing drawings: elevations, sections, roof plans
  • Photographs of each elevation, plus close-ups of gutters, hoppers and pipe detail
  • Any previous survey, quinquennial inspection or condition report
  • Historic photographs, if any exist
  • A written note of where the system is known to fail

Access to arrange

  • Confirm what access will be available on the day and who is providing it
  • Where scaffold is in place or planned, confirm the dates it is available
  • For a platform survey, check ground conditions, working headroom, overhead cables and vehicle access
  • Confirm roof access arrangements, keys, and any permit-to-work requirements
  • Identify fragile roof coverings, live services and any occupied areas

On the day

  • Provide a point of contact who knows the building
  • Allow removal of a sample component where reproduction is anticipated, and obtain consent for it in advance if the building is listed
  • Make previous paint or repair records available if they exist
  • Agree what will be recorded and what will be left for a later visit if access is incomplete

18. What a survey does not do

A rainwater-goods survey is a specialist inspection with a defined purpose, and it does not substitute for the other assessments a project may need. Being clear about this protects everybody.

A survey of this kind does not constitute a structural assessment of the building or its roof, a roofing survey or condition report on the roof covering, a drainage survey or CCTV investigation of below-ground drainage, a heritage significance assessment for listed building consent, an asbestos or hazardous materials survey, or a health and safety assessment for the works themselves. Where the survey identifies matters falling into those areas — decayed rafter feet, a failing roof covering, a drain that appears blocked — it should record them and recommend that they are investigated by the appropriate specialist.

Nor does a survey remove the need for verification. Measurements taken at height, from a platform, or on a building that is not square should be treated as working figures and confirmed before manufacture — particularly for bespoke and copy cast components, where an error becomes physical.

19. Buildings where the survey decides the project

The buildings below illustrate the range of survey conditions that heritage rainwater work involves. They are given as representative examples of the technical challenge rather than as project references.

Lincoln Cathedral, Lincolnshire

Grade I listed and one of the great English Gothic cathedrals, largely of the 13th century, Lincoln presents the survey problem in its most extreme form: extraordinary height, a complex arrangement of parapet, valley and aisle gutters, and stonework where any fixing decision has conservation consequences. On buildings of this scale, survey is inseparable from access — what can be recorded is determined entirely by where the surveyor can safely be, and by which parts of the roofscape a scaffold or platform can reach.

The Piece Hall, Halifax, West Yorkshire

Grade I listed, built in 1779 as a cloth hall and comprehensively restored in the present century, the Piece Hall’s colonnaded quadrangle presents long, highly repetitive runs of identical elevation. Uniformity is deceptive on such buildings: a survey must confirm that the profile really is consistent along every side rather than assume it, since phased repairs over two centuries commonly introduce near-matches that read as differences once new work is installed alongside.

Cardiff Castle, Cardiff

Grade I listed, and remodelled from 1866 by William Burges for the 3rd Marquess of Bute into one of the outstanding Gothic Revival interiors in Europe, Cardiff Castle exemplifies the decorative survey. Where rainwater components are themselves designed elements, recording them demands square-on photography with scale, templates, and attention to depth of relief. In Wales the consent framework runs through Cadw and the Welsh planning system, so the record of what is original carries additional weight.

Holmwood House, Glasgow

Category A listed and in the care of the National Trust for Scotland, Alexander “Greek” Thomson’s villa of 1857 to 1858 is a building where every external element was designed as part of a coherent classical composition. Surveying rainwater goods on such a house means recording not only dimension and condition but intent — where a pipe was placed to be concealed, where a hopper was placed to be seen, and what the original coating evidence suggests about the finish Thomson specified.

Grainger Town, Newcastle upon Tyne

The listed Georgian and early Victorian core of Newcastle, developed by Richard Grainger in the 1830s and including the Grade I listed Grey Street, presents the terrace survey problem: continuous runs crossing multiple ownerships, party wall junctions, concealed drainage behind parapets, and a townscape where consistency of profile and colour across the whole street matters more than any individual building’s preference.

20. Frequently asked questions

What does a cast iron rainwater-goods site survey actually cover?

It records the existing system in enough detail to specify and manufacture from: gutter and pipe profiles identified positively, girths, diameters, run lengths, falls, fixing centres, offsets and discharge points measured, all hoppers, brackets and fittings scheduled by location, condition assessed run by run, coatings recorded, original fabric distinguished from later replacement, and the interfaces with roof, masonry and drainage noted.

Do I need a site survey before ordering cast iron guttering?

Not always. Where the building is straightforward, the profile is a current stock item, an intact sample can be sent to us and access is simple, a survey adds little. It becomes valuable where the profile cannot be identified confidently, components are missing or damaged, copy casting is proposed, access is difficult, or the building is listed and the extent of original fabric will determine what consent is granted.

What is the difference between a visual inspection and a measured survey?

A visual inspection produces a qualitative account of what is there and its apparent condition, usually from ground level or existing access, and is useful for deciding whether more is needed. A measured survey produces dimensioned records — profiles, girths, lengths, falls, fixing centres and component positions — which is what a specification, a quotation and a pattern actually require.

How do you measure a cast iron gutter accurately?

Girth or diameter is best taken from a template, profile gauge or rubbing rather than a tape, because the shape matters as much as the dimension. Run lengths are measured along the gutter elevation by elevation with angles and outlets located. Falls are levelled from a datum, recording height at both ends and at the outlet. Curved gutters need chord and rise measurements or a physical template.

Can you identify a gutter profile from a photograph?

Sometimes, and it is always worth sending photographs as a first step. But ogee variants in particular are very difficult to separate at height, and a photograph taken from the ground at an angle will not reliably distinguish them. Where the profile matters — and on a heritage building it always does — a square-on photograph against a rule, a template, or a physical sample is far more reliable.

Do I need scaffolding for a rainwater-goods survey?

Not necessarily. Ground-level inspection, existing roof access, a mobile elevating work platform or aerial photography may all be appropriate depending on the building and what needs establishing. Scaffold gives the most complete access and is the obvious choice where it is already up for other work. What matters is that the access matches what the survey needs to achieve.

How do you tell original cast iron guttering from a later replacement?

The strongest evidence is foundry marks and pattern numbers cast into the reverse of gutters, brackets and hoppers, which are frequently overlooked. Casting character, surface texture, parting lines and section weight also differ between periods. Profile inconsistency along a run, differing joint or fixing detail, and paint layer count all help. Where several generations are present, the survey should say so.

Will you take a sample away for pattern-making?

Where reproduction is anticipated, a single sound section is by far the best reference for a pattern, because it captures profile, dimension, joint detail and surface character at once. On a listed building, removal usually needs consent, and the component should be recorded photographically in position first. Where removal is not possible, a template taken on site is the next best option.

How long after a survey can components be manufactured?

Standard stock items matching a confirmed profile are available for prompt despatch, subject to confirming current availability. Bespoke and copy cast components typically require 12 to 14 weeks from pattern confirmation to delivery, and radius gutters typically 12 to 14 weeks because templates must be made before pattern-making begins. Approval stages for patterns and samples should be added to that.

Does a site survey replace a structural or roofing survey?

No. A rainwater-goods survey is a specialist inspection with a defined purpose. It does not constitute a structural assessment, a roofing condition survey, a drainage or CCTV investigation, a heritage significance assessment, an asbestos survey or a health and safety assessment. Where it identifies matters in those areas it should record them and recommend investigation by the appropriate specialist.

Is a site survey chargeable?

Yes. Site surveys and site visits are a chargeable professional service. We would frame that as project protection rather than an extra: on complex restorations, difficult-access buildings and copy casting commissions, the cost of establishing the facts is consistently less than the cost of discovering them after castings have been made.

What should I have ready before a surveyor arrives?

Existing drawings and photographs, any previous survey or quinquennial inspection, a written note of where the system fails, confirmation of listed status and any consent already obtained, and — most importantly — settled access arrangements with the dates confirmed. A point of contact who knows the building is worth a great deal on the day.

21. Turning a survey into a system that suits the building

A survey is only worth commissioning if it answers the questions the project is about to ask. On a cast iron rainwater project those questions are consistent: what profile, what size, what condition, what is original, what can be repaired, what must be reproduced, and what will it take to install. A survey that answers those, and is honest about what it could not reach, removes almost all of the risk that would otherwise be priced into a tender or discovered on a scaffold.

We supply cast iron gutters, downpipes, hopper heads and fittings for conservation and restoration projects, and we can help at the stage before the order is placed. We are glad to look at photographs and drawings and give an initial view at no cost. Where more is needed, we offer site survey visits, ground surveys and aerial platform surveys as a chargeable professional service, and we can review existing details, match profiles, identify components, advise on finishes and develop a project-specific solution including radius and bespoke work. We provide product information and technical guidance; we do not assume design responsibility unless that is agreed separately in writing. To discuss a building, call 0333 987 4452 or contact us.



Facebook
Twitter
LinkedIn
Pinterest
PrevPrevious
NextNext
Tuscan Foundry Products Logo White

CONTACT US

Sales & Customer Services:
0333 987 4452

Tyn-Y-Clyn
Llanafan Fawr
Builth Wells
Powys LD2 3LU
United Kingdom

FOLLOW US

Twitter

MESSAGE US

ABOUT US
  • About Us
  • News
  • Gallery
  • About Us
  • News
  • Gallery
PRODUCTS
  • Bespoke Commissions
  • Cast Iron Soil Pipes
  • Cast Iron Gutters & Pipes
  • Heating & Cast Iron Radiators
  • Hardware & Spares
  • Cast Iron Radius Guttering
  • Bespoke Commissions
  • Cast Iron Soil Pipes
  • Cast Iron Gutters & Pipes
  • Heating & Cast Iron Radiators
  • Hardware & Spares
  • Cast Iron Radius Guttering
SUPPORT
  • Brochures
  • Delivery
  • International Shipping
  • Downloads
  • Surveys & Visits
  • Rooflight Guide
  • Brochures
  • Delivery
  • International Shipping
  • Downloads
  • Surveys & Visits
  • Rooflight Guide
CONTACT
  • Contact
  • Referral Scheme
  • FAQ
  • Privacy Policy
  • Terms And Conditions
  • Contact
  • Referral Scheme
  • FAQ
  • Privacy Policy
  • Terms And Conditions
Tuscan Foundry Products Logo Black
Find out more about our products by giving us a call
0333 987 4452

Tuscan Foundry Products, Tyn-Y-Clyn, Llanafan Fawr, Builth Wells, Powys LD2 3LU, United Kingdom

© Tuscan Foundry Products 2026